A 950 KW Chiller lift was safely completed despite the inclement weather conditions.
As part of a series of Chiller replacements for Bausch and Lomb, Weltec safely lifted this 950 KW Chiller onto the roof of the Bausch and Lomb plant in Waterford.
Working with East Cork Crane Hire, a 250-tonne crane was used to lift the Chiller weighing 10 tonnes. Kevin Wiley Bausch + Lomb Ireland East Cork Crane Hire Ltd. #mechanicalengineering #mechanicalcontractors #electricalcontractors