Cheese manufacturing plant utilities have to be right first time, and that was the brief Weltec Engineering delivered at Kilkenny Cheese in Waterford. Kilkenny Cheese is a joint venture established in 2019 between Tirlán and family-owned international dairy business, Royal A-ware, to deliver a best-in-class sustainable continental cheese facility. At the centre of the utilities package is a 1.6 MW roof-mounted solar farm, working alongside a 1.6 MWe on-site CHP unit.
M&E utilities scope of works
Weltec’s mechanical and electrical package covered the utilities for the new cheese manufacturing plant, including the 1.6 MW roof-mounted solar farm. All utilities were brought to the main distribution locations for distribution around the plant.
The design and install element of the package included:
- 5 no. 1.8 MW natural gas fired boilers
- 160 m³/hr water softening skid
- 3 no. 75 kW air compressors
- 1.6 MWe self-contained CHP unit
- Associated LV/MV transformers and equipment
1.6 MW rooftop solar and on-site CHP
Solar generation and combined heat and power sit at the centre of the energy strategy for the facility. The 1.6 MW rooftop array and the 1.6 MWe CHP unit generate electricity on site, while the CHP unit and the gas fired boilers provide process heat. Water softening and compressed air complete the utility set for the plant.
Why utilities matter in cheese production
Continental cheese production is a utilities-intensive process. Pasteurisation, curd handling, brining and clean-in-place cycles all draw on steam, treated water, compressed air and reliable electrical power, and an interruption to any one of them can affect both product quality and output. Designing the utilities package around the process gives a cheese manufacturing plant the headroom it needs for future capacity while keeping energy use and running costs under control.
Design and build delivery in 42 weeks
Working with consulting engineer CSD, Weltec delivered the €8 million M&E utilities scope over a 42-week programme. Taking the utilities from design through installation and commissioning under a single design and build contract kept responsibility for the services package in one place.
Award recognition
This project was shortlisted for the Irish Construction Excellence Awards.
Kilkenny Cheese project FAQs
Who was the client?
Kilkenny Cheese, the joint venture between Tirlán and Royal A-ware.
What was the value of the M&E package?
The M&E utilities package was valued at €8,000,000.
How long did the project take?
The package was delivered over a 42-week programme.
Where is the cheese manufacturing plant located?
The facility is located in Waterford, Ireland.
What did Weltec’s scope include?
M&E utilities installation on a design and build basis, covering a 1.6 MW roof-mounted solar farm, five 1.8 MW natural gas fired boilers, a 160 m³/hr water softening skid, three 75 kW air compressors, a 1.6 MWe CHP unit and associated LV/MV transformers and equipment, with all utilities brought to the main distribution locations.
Working with Weltec on utilities design and build
Weltec Engineering acted as a single point of responsibility for mechanical, electrical and utility packages, covering design development, procurement, installation, testing and commissioning. That approach suits clients who need utilities coordinated with both the process equipment and the wider construction programme, with a clear line of accountability for performance at handover.
M&E and utilities for food and beverage plants
Weltec Engineering designs, installs and commissions mechanical, electrical and utility systems across the food and beverage sector, from dairy and cheese manufacturing plant projects to wider process facilities. If you are planning a new plant or upgrading existing utilities, talk to the Weltec team about your project.